PR Newswire
LONDON, United Kingdom, February 03
3 February 2026
Critical Mineral Resources Plc
Drilling ramping-up following oversubscribed fundraise
Critical Mineral Resources plc («CMR», «Company») is pleased to report that
following the recently completed and heavily oversubscribed fundraise, diamond
drilling with two rigs is ramping-up over the coming weeks as the weather
improves. Drilling during H1 is designed to produce Agadir Melloul’s maiden
resource estimate, targeted for publication in early Q3 2026.
Key Highlights
· Accelerated drill programme at Agadir-Melloul
· Two diamond rigs ramping-up to two shifts per day each
· 20 holes planned per month from mid-February
· Agadir Melloul’s maiden resource estimate targeted for Q3 2026
Fig.1 Company’s diamond rig at Agadir Melloul
[A group of men working on a machineAI-generated content may be incorrect.]
Source: Company
Charlie Long CEO commented:
«With two rigs now turning, we anticipate an extremely productive drill
programme and for an internal maiden resource to be modelled by late Q2 and for
the JORC compliant resource estimate to be published in early Q3.
Drilling has been intermittent in recent weeks due to inclement weather. This
week both rigs are operating on day shifts, and once the weather improves night
shifts will be introduced. From then on we should be drilling 20 holes per month
equating to approximately 1,000m.
For a near-surface project like this, metres drilled is less important than the
number of holes drilled. Each hole will range from 20m to 50m depth, with the
occasional deeper hole to drill-test the basement as we continue the hunt for
mineralised rhyolite.
It’s worth reiterating that near-surface mineralisation is quite unusual and a
huge economic advantage in terms of opex, upfront capex, reserve development
capex and ongoing sustaining capex».
ENDS
+————————————+——————–+
|Critical Mineral Resources plc |[email protected] |
| | |
|Charles Long,Chief Executive Officer| |
+————————————+——————–+
|Shard Capital LLP |+44 (0) 207 186 9952|
| | |
|Erik Woolgar |+44 (0) 20 7399 9425|
| | |
|Damon Heath | |
| | |
|AlbR Capital | |
| | |
|Jon Belliss | |
+————————————+——————–+
Notes To Editors
Critical Mineral Resources (CMR) PLC is an exploration and development company
focused on developing assets that produce critical minerals for the global
economy, including those essential for electrification and the clean energy
revolution. Many of these commodities are widely recognised as being at the
start of a supply and demand super cycle.
CMR is building a diversified portfolio of high-quality metals exploration and
development projects in Morocco, focusing on copper, silver and potentially
other critical minerals and metals. CMR identified Morocco as an ideal mining
-friendly jurisdiction that meets its acquisition and operational criteria. The
country is perfectly located to supply raw materials to Europe and possesses
excellent prospective geology, good infrastructure and attractive permitting,
tax and royalty conditions.
The Company is listed on the London Stock Exchange (CMRS.L). More information
regarding the Company can be found at www.cmrplc.com
This information was brought to you by Cision http://news.cision.com
https://news.cision.com/critical-mineral-resources-plc/r/drilling-update,c4301549
The following files are available for download:
https://news.cision.com/critical-mineral-resources-plc/i/4301549-0-jpeg,c3507173 4301549_0.jpeg

excelente comentario de las ferias virtuales, estamos en el mismo medio y ha sido un exito tener una feria por internet, voy a tomar este articulo como referencia en mi blog.
Gracias!
Feria Latina en Internet
http://www.lapaginamasvisitada.com/
las ferias virtuales son para el libre comercio..jaja..mentira!..no se nada.